Sainsbury's Energy – 2018/19 Schedule of Customer Fees

Sainsbury's Energy – 2018/19 Schedule of Customer Fees

 

 

Electricity Meter Operator (MOP)

Volume

Up to 200k

 

 

(Traditional & Smart Meters)z

 

Zone A

Zone B

Zone C

1a

Installation of New Metering System

1 phase trad

£70.61

£81.20

£123.57

1b

Installation of New Metering System

1 phase smart

 

 

 

1c

Installation of New Metering System

3 phase trad

£113.01

£129.96

£197.77

1d

Installation of New Metering System

CT trad

£198.10

£227.81

£346.67

1e

Installation of New Metering System - dual fuel electricity & gas (with third party MAP)

Smart dual fuel

 

 

 

2a

Metering System Exchange due to Faulty or Damaged Metering System

1 phase trad

£59.48

£68.41

£104.10

2b

Metering System Exchange due to Faulty or Damaged Metering System

1 phase smart

 

 

 

2c

Metering System Exchange due to Faulty or Damaged Metering System

3 phase trad

£103.11

£118.57

£180.44

2d

Metering System Exchange due to Faulty or Damaged Metering System

CT trad

£183.76

£211.33

£321.59

3a

Metering System Exchange due to Functionality Change (including credit to pp & pp to credit)

1 phase trad

£67.41

£77.52

£117.97

3b

Metering System Exchange due to function/type Change (including traditional to smart and all exchange combinations)

1 phase smart

 

 

 

3c

Metering System Exchange due to Functionality Change

3 phase trad

£113.01

£129.96

£197.77

3d

Metering System Exchange due to Functionality Change

CT trad

£183.76

£211.33

£321.59

3e

Metering System Exchange due to function/type Change (including traditional to smart and all exchange combinations)

Smart dual fuel

 

 

 

4a

Metering System Exchange due to Recertification

1 phase trad

£58.96

£67.80

£103.18

4b

Metering System Exchange due to Recertification

1 phase smart

 

 

 

4c

Metering System Exchange due to Recertification

3 phase trad

£101.54

£116.77

£177.70

4d

Metering System Exchange due to Recertification

CT trad

£196.80

£226.32

£344.39

5a

Repositioning of Metering System

1 phase trad

£72.47

£83.34

£126.82

5b

Repositioning of Metering System

1 phase smart

£115.18

£132.46

£201.57

5c

Repositioning of Metering System

3 phase trad

£135.63

£155.97

£237.35

5d

Repositioning of Metering System

CT trad

£196.80

£226.32

£344.39

6a

 Installation of Check Meter or Removal of Check Meter

1 phase trad

£97.03

£111.59

£169.81

6b

 Installation of Check Meter or Removal of Check Meter

1 phase smart

£102.77

£118.19

£179.85

6c

 Installation of Check Meter or Removal of Check Meter

3 phase trad

£112.68

£129.58

£197.19

6d

 Installation of Check Meter or Removal of Check Meter

CT trad

£162.91

£187.35

£285.10

7a

Metering System Accuracy Test

1 phase trad

£104.26

£119.90

£182.46

7b

Metering System Accuracy Test

1 phase smart

£108.31

£124.56

£189.54

7c

Metering System Accuracy Test

3 phase trad

£116.68

£134.18

£204.18

7d

Metering System Accuracy Test

CT trad

£188.98

£217.33

£330.71

8

Reset / Reprogramme Prepayment Metering System

1 phase trad

£41.86

£48.13

£73.25

9a

Proving Test New or Re-energised Automated Meter Reading Metering System (additional to meterwork charge)

1 phase trad / 3 phase trad

£45.62

£52.46

£79.83

9b

Investigate Smart Metering System Fault

1 phase smart

£82.27

£94.61

£143.97

9c

Investigate Smart Metering System Fault

Smart dual fuel

£149.39

£171.80

£261.43

10a

Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System

1 phase trad

£64.38

£74.03

£112.66

10b

Install a Communications Module or replace a faulty Communications Module to a Smart (ready) Metering System

1 phase smart

£64.38

£74.03

£112.66

10c

Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System

3 phase trad

£64.38

£74.03

£112.66

10d

Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System

CT trad

£64.38

£74.03

£112.66

11a

De-energise or Re-energise Metering System

1 phase trad

£44.51

£51.18

£77.88

11b

De-energise or Re-energise Metering System

1 phase smart

£44.51

£51.18

£77.88

11c

De-energise or Re-energise Metering System

3 phase trad

£44.51

£51.18

£77.88

11d

De-energise or Re-energise Metering System

CT trad

£44.51

£51.18

£77.88

12a

De-energise and Remove Metering System

1 phase trad

£48.62

£55.92

£85.09

12b

De-energise and Remove Metering System

1 phase smart

£64.29

£73.94

£112.51

12c

De-energise and Remove Metering System

3 phase trad

£65.56

£75.39

£114.73

12d

De-energise and Remove Metering System

CT trad

£65.56

£75.39

£114.73

12e

De-energise and Remove Metering System

Smart dual fuel

£119.88

£137.86

£209.78

13

Out of Hours Installation – Weekday (installations commencing outside of Working Hours),  additional to meter work charges.

 

£162.91

£187.35

£285.09

14

Out of Hours Installation – Weekend (installation commencing outside of Monday to Friday hours or Bank Holidays), additional to meter work charges.

 

£175.95

£202.34

£307.90

15

 In Hours Callout/Emergency Visit (investigate meter fault, supply interrupted, additional to meter work charges)

 

£98.05

£112.76

£171.59

16

Out of Hours Callout / Emergency Visit, additional to meter work charges

 

£126.29

£145.23

£221.01

17

Abort including where Appointments are cancelled by the Supplier within 12 Working Hours of the Site Visit

 

£37.41

£43.02

£65.47

18

Site Attendance with Examiner / Supplier / warrant visit (/half day or part thereof)

 

£260.66

£299.75

£456.15

19

Overtime Rate (additional) (/hour or part thereof)

 

£32.58

£37.47

£57.02

20

Collection and Return of Property Keys (more than 0.5miles and 5 minutes travel time) (additional)

 

£20.85

£23.97

£36.48

21

Special Site Visit and ancillary equipment work such as any additional non standard meter installation material costs including tails, connector blocks, new boards, new fuses, aerials etc.

 

 

 

 

22

Short notice appointments (additional)

 

£28.67

£32.97

£50.17

23

am / pm appointments (additional)

 

£7.82

£8.99

£13.69

24

4 or 2 hour banded appointments (additional)

 

£15.63

£17.98

£27.35

25

Daily congestion charge (London)

 

 

 

 

26

Technical Inspection Visits

 

£63.87

£73.45

£111.77

27

Non-technical Inspection Visits

 

£39.09

£44.96

£68.41

 

 

Volume -

The volume is the number of electricity Metering Systems registered in the operational Lowri Beck system for the measured month.

The volume is calculated on a monthly basis.

Zone A is GSP Areas - Eastern, Seeb, South, Sweb.

Zone B is GSP Areas - London, Swalec, Midi, East Midlands, Manweb, Norweb, Yorkshire, North East, South Scotland.

Zone C is GSP Areas - North Scotland (Not currently available - Please speak with your Lowri Beck Account Manager regarding availability)

This Electricity MOP Maintenance Service is only currently available with Lowri Beck Meters MAP Service.

Items 1b, 1e, 2b, 3b, 3e, and 4b would be charged to Lowri Beck Meters as the nominated MAP Service Provider.

 

 

 

Gas Meter Asset Manager (MAM)

Volume

Up to 200k

 

 

(Traditional & Smart Meters)

 

Zone A

Zone B

Zone C

1a

Installation of New Metering System

U6 Trad Credit

£77.03

£88.58

£134.80

1b

Installation of New Metering System

U6 Trad Prepay

£90.19

£103.72

£157.84

1c

Installation of New Metering System

U6 Smart 

 

 

 

2a

Metering System Exchange due to Faulty or Damaged Metering System

U6 Trad Credit

£86.93

£99.97

£152.14

2b

Metering System Exchange due to Faulty or Damaged Metering System

U6 Trad Prepay

£100.03

£115.03

£175.05

2c

Metering System Exchange due to Faulty or Damaged Metering System

U6 Smart

 

 

 

3a

Metering System Exchange due to Functionality Change

U6 Trad Credit

£86.93

£99.97

£152.14

3b

Metering System Exchange due to Functionality Change

U6 Trad Prepay

£100.03

£115.03

£175.05

3c

Metering System Exchange due to Functionality Change

U6 Smart

 

 

 

4a

Metering System Exchange due to Policy Exchange

U6 Trad Credit

£93.83

£107.91

£164.21

4b

Metering System Exchange due to Policy Exchange

U6 Trad Prepay

£103.74

£119.30

£181.54

4c

Metering System Exchange due to Policy Exchange

U6 Smart

 

 

 

5a

Repositioning of Metering System

U6 Trad Credit

£79.12

£90.98

£138.45

5b

Repositioning of Metering System

U6 Smart/Prepay

£88.88

£102.21

£155.54

6a

Remove Metering System

U6 Trad Credit

£64.26

£73.90

£112.45

6b

Remove Metering System

U6 Smart/Prepay

£74.09

£85.21

£129.66

7a

Metering System Accuracy Test

U6 Trad Credit

£145.97

£167.86

£255.44

7b

Metering System Accuracy Test

U6 Smart/Prepay

£159.14

£183.01

£278.50

8

Reset / Reprogramme Prepayment Metering System

U6 Smart/Prepay

£79.05

£90.90

£138.33

9a

Proving Test New or Re-energised Automated Meter Reading Metering System (additional to meterwork charge)

U6 Trad Credit / Trad Prepay

£45.62

£52.46

£79.83

9b

Investigate Smart Metering System Fault

U6 Smart 

£90.19

£103.72

£157.84

10a

Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System

U6 Trad Credit

£64.38

£74.03

£112.66

10b

Install a Communications Module or replace a faulty Communications Module to an AMR (ready) Metering System

U6 Smart/Prepay

£77.55

£89.19

£135.72

11a

De-commission or Re-commission Metering System

U6 Trad Credit

£64.26

£73.90

£112.45

11b

De-commission or Re-commission Metering System

U6 Smart/Prepay

£74.16

£85.29

£129.79

12a

OAMI Inspection

U6 Trad Credit

£79.12

£90.98

£138.45

12b

OAMI Inspection

U6 Smart/Prepay

£79.12

£90.98

£138.45

13

Out of Hours Installation – Weekday (installations commencing outside of Working Hours),  additional to meter work charges.

 

£162.91

£187.35

£285.10

14

Out of Hours Installation – Weekend (installation commencing outside of Monday to Friday hours or Bank Holidays), additional to meter work charges.

 

£175.95

£202.34

£307.91

15

 In Hours Callout / Emergency Visit (investigate meter fault, supply interrupted, additional to meter work charges)

 

£98.06

£112.77

£171.60

16

Out of Hours Callout / Emergency Visit, additional to meter work charges

 

£126.30

£145.24

£221.02

17

Abort including where Appointments are cancelled by the Supplier within 12 Working Hours of the Site Visit

 

£53.43

£61.45

£93.51

18

Site Attendance with Examiner / Supplier / warrant visit (/half day or part thereof)

 

£286.73

£329.74

£501.77

19

Overtime Rate (additional) (/hour or part thereof)

 

£35.85

£41.23

£62.74

20

Collection and Return of Property Keys (more than 0.5miles and 5 minutes travel time) (additional)

 

£20.85

£23.98

£36.49

21

Special Site Visit and ancillary equipment work such as any additional non standard meter installation material costs including new pipework, new/repair meter box, new regulators, aerials etc

 

Ancillary work charges apply

 

 

22

Short notice appointments (additional)

 

£28.67

£32.97

£50.17

23

am / pm appointments (additional)

 

£7.82

£8.99

£13.68

24

2 hour banded appointments (additional)

 

£15.63

£17.98

£27.36

25

Daily congestion charge (London)

 

£ recompensed at charge rate

 

 

26

Technical Inspection Visits

 

£63.86

£73.44

£111.76

27

Non-technical Inspection Visits

 

£39.10

£44.96

£68.42

 

 

Volume -

     

 

The volume is the number of gas Metering Systems registered in the operational Lowri Beck system for the measured month.

 

The volume is calculated on a monthly basis.

     

 

Zone A is GSP Areas - Eastern, Seeb, South, Sweb.

     

 

Zone B is GSP Areas - London, Swalec, Midi, East Midlands, Manweb, Norweb, Yorkshire, North East, South Scotland.

Zone C is GSP Areas - North Scotland (Not currently available - Please speak with your Lowri Beck Account Manager regarding availability)

This Gas MAM Maintenance Service is only currently available with Lowri Beck Meters MAP Service.

       

Items 1c, 2c, 3c and 4c would be charged to Lowri Beck Meters as the nominated MAP Service Provider.